TECHNICAL SPECIFICATIONS

Overall Length

105.00m

Beam

40.8m

Maximum Draft

5.1m

Year Built

0000

Accommodation

120 Berths

Dynamic Positioning

DP1 System

VESSEL OVERVIEW

A 800-ton self-elevating wind power installation vessel designed for installation of large-megawatt wind turbines, replacement of major wind-turbine components and life-support duties for offshore oil platforms. This vessel is configured as a four-legged self-elevating unit with hydraulic jacking, an 800-ton full-slewing main crane and DP1-assisted manoeuvring capability.

075118 Turbine Vessel.png

PRINCIPAL PARTICULARS

Vessel type: 800-ton Self-Elevating Wind Power Installation Vessel

Primary applications: Large-megawatt wind turbine installation; major wind-turbine component replacement; offshore oil-platform life support

Classification: CCS

Class notation stated in source: CSA Self-Elevating Offshore Wind Turbine Service Unit; Thruster; Crane Unit; Lifting Appliance; IWS; DP1

Dynamic positioning: DP1

Navigation: Coastal

Length overall: 105 m

Breadth: 40.8 m

Depth: 7.5 m

Load draft: approximately 5.1 m

Maximum operating water depth: 50 m

Accommodation: 120 persons

Variable load: 2,000 tonnes maximum

Main deck load capacity: 120 kN/m²

SELF-ELEVATING / JACKING SYSTEM

Number of legs: 4

Leg diameter: 3.9 m

Overall leg length: 97.7 m

Usable leg length: 76 m

Pile shoe dimensions: 11.6 m × 9.2 m × 2.2 m

Pile pulling capacity: approximately 5,500 tonnes

Single-leg pre-pressure: approximately 6,300 tonnes

Lift-cylinder speed: approximately 0.45 m/min

Jacking system: Hydraulic

Maximum stated operating water depth: 50 m

MAIN CRANE & LIFTING EQUIPMENT

Main crane: 800-ton full-slewing crane

Main hook capacity in jacking condition: 800 tonnes at radii of approximately 24–35 m

Main hook lifting height: up to approximately 143.8 m above deck in the supplied lifting data

Main hook rated capacities by radius: 800 t at 24, 27, 30 and 35 m; 620 t at 40 m; 480 t at 45 m; 380 t at 50 m; 290 t at 55 m; 220 t at 60 m; 160 t at 65 m; 110 t at 70 m; 65 t at 75 m; 30 t at 80 m

Auxiliary hook: 280-ton capacity at approximately 27.9–39.9 m radius in jacking condition

Auxiliary hook maximum stated lifting height: approximately 154.2 m above deck

Auxiliary hook rated capacities by radius: 280 t at 27.9, 31.2, 34.5 and 39.9 m; 235 t at 45.4 m; 190 t at 50.8 m; 140 t at 56.2 m; 105 t at 61.7 m; 75 t at 67.1 m; 55 t at 72.5 m; 40 t at 78.0 m; 25 t at 83.4 m; 15 t at 88.8 m

Rigging hooks: 2 × 10-ton

Main crane floating-state capacity: The supplied lifting data gives reduced floating-state capacities; refer to the vessel's certified crane load chart for operational limits

Auxiliary crane floating-state capacity: The supplied lifting data gives reduced floating-state capacities; refer to the vessel's certified crane load chart for operational limits

PROPULSION, THRUSTERS & POSITIONING

Bow thrusters: 2 × azimuth thrusters, 1,000 kW each

Stern thrusters: 2 × azimuth thrusters, 1,800 kW each

Total installed thruster power: 9,600 kW

Positioning / station keeping: DP1 plus self-elevating jacking and anchoring arrangements

ANCHORING EQUIPMENT

Port anchor winch: 500 kN × 50 mm wire × 650 m – 1 unit

Starboard anchor winch: 500 kN × 50 mm wire × 650 m – 1 unit

Positioning anchors: 2 × 10-ton Deertai HHP anchors

Electric winches: 4 × 10-ton electric winches, 110 m

POWER GENERATION & ELECTRICAL SYSTEM

Main diesel generator sets: 4 × 1,800 kW

Main electrical system: 690 V / 50 Hz

Emergency / harbour generator: 1 × 600 kW

Emergency / harbour electrical system: 380 V / 50 Hz

Total main generator capacity: 7,200 kW

Total generator capacity including emergency / harbour set: 7,800 kW

DECK & CARGO CAPABILITY

Variable load: Up to 2,000 tonnes

Main deck loading: 120 kN/m²

Deck suitability: Configured for heavy offshore wind-turbine installation and major component handling, subject to approved load plans and operational limitations

GENERAL ARRANGEMENT / DECK LEVELS

CRANE OPERATING DATA – SUPPLIED LIFTING INFORMATION

Main deck elevation: 7,500 mm ABL

01 deck: 11,300 mm ABL

02 deck: 14,500 mm ABL

03 deck: 17,700 mm ABL

04 deck: 20,900 mm ABL

Top deck: 24,100 mm ABL

Additional deck levels stated: 1,200 mm ABL and 2,400 mm ABL

Frame spacing: 0.70 m between FR-22 and FR0; 0.60 m between FR0 and FR150

The supplied technical brief includes detailed main-hook and auxiliary-hook load/radius/height information for both jacking and floating conditions. The principal jacking-state main-hook data demonstrates an 800-tonne capacity through approximately 35 m radius, reducing with increasing radius. The supplied charts should be used together with the certified crane load chart, stability booklet and approved operating procedures before any commercial or operational commitment.

INTENDED OFFSHORE APPLICATIONS

Installation of large-megawatt offshore wind turbines.

Installation and handling of major wind-turbine components.

Replacement of major offshore wind-turbine components.

Offshore construction and heavy-lift support within the vessel's certified operating envelope.

Life-support and accommodation duties for offshore oil platforms.

Self-elevating operations in water depths up to the stated 50 m operating limit, subject to site-specific geotechnical and environmental assessment.

COMMERCIAL POSITION

Availability: Offered for sale or long-term charter

Broker: MJM Offshore Ltd

Commercial enquiries: MJM Offshore Ltd will provide further technical, commercial and inspection information to qualified parties subject to owner approval and the applicable confidentiality / due-diligence process.

TECHNICAL & COMMERCIAL DISCLAIMER

This specification has been prepared by MJM Offshore Ltd from the technical information figures are presented as stated in the source material and should not be interpreted as independent verification. Prospective buyers and charterers should conduct their own technical, class, flag, statutory, condition, lifting, stability, jacking, leg penetration, geotechnical and operational due diligence. Final capabilities and operating limits are subject to the vessel's approved documentation, certificates, class requirements, site conditions and the owner's confirmation.