top of page
TECHNICAL SPECIFICATIONS

Overall Length

176.00m

Beam

50.0m

Maximum Draft

12.0m

Year Built

0000

Accommodation

320 Berths

Dynamic Positioning

DP3 System

SWIBER KAIZEN 4000  For Sale

  • MJM Offshore Ltd is pleased to present a rare opportunity to acquire the SWIBER KAIZEN 4000, a large-scale offshore construction asset currently located at a major Chinese shipyard against undergoing conversion into a DP3 Heavy Lift & Pipelay Construction Vessel.

  • Originally developed as a 3,800-ton heavy lift derrick vessel, the project underwent substantial engineering and capital investment to transform the asset into a state-of-the-art DP3 offshore construction and pipelay vessel capable of supporting major offshore energy developments worldwide.

011472 swiber kairen.png

PROJECT OVERVIEW

  • Due to the financial collapse and subsequent liquidation of the previous operating company, the conversion programme was suspended prior to final completion and commissioning.

  • The vessel is presently in cold lay-up and under the control of Chinese financial and shipyard interests.

CONVERSION PROJECT SCOPE

CURRENT STATUS

  • Vessel presently maintained in cold lay-up at Chinese shipyard facilities.

  • Previous operating company liquidated and no longer holds ownership rights or operational control.

  • Vessel available for acquisition subject to owner approval.

  • Significant conversion works completed prior to project suspension.

  • Major heavy lift crane remains installed onboard.

  • DP3 conversion package substantially advanced.

  • Pipelay conversion package substantially advanced.

  • Major project equipment understood to remain available within the shipyard project inventory.

  • Final completion status subject to technical due diligence and physical inspection.

  • The vessel was designed to be converted into a world-class offshore construction vessel incorporating:

  • • DP3 Dynamic Positioning System.

  • • Offshore Heavy Lift Capability.

  • • S-Lay Pipeline Installation System.

  • • Accommodation Facilities for Offshore Construction Personnel.

  • • Helideck Facilities.

  • • Subsea Construction Support Capability.

  • • Hook-Up and Commissioning Support.

  • • Offshore Field Development Capability.

PRINCIPAL PARTICULARS

  • Vessel Name: SWIBER KAIZEN 4000

  • Vessel Type:
    Heavy Lift Offshore Construction Asset
    DP3 & Pipelay Conversion Project

  • Length Overall:176.0 m

  • Length Hull:156.0 m

  • Breadth:50.0 m

  • Depth:12.0 m

  • Accommodation: Approximately 320 Personnel

  • Main Crane: NOV AmClyde 3,800T Derrick Crane

  • Pipelay Capability: Up to 60-inch Pipeline Diameter

  • Dynamic Positioning: DP3 Conversion Project

MAJOR EQUIPMENT PACKAGE

  • The project includes the principal equipment required for completion of the conversion programme, including:

  • NOV AmClyde 3,800T Derrick Crane.

  • Kongsberg DP3 Dynamic Positioning System.

  • Azimuth Thrusters and Retractable Thruster Package.

  • Main Power Generation Package.

  • S-Lay Pipelay System.

  • Tensioner Systems.

  • Abandonment & Recovery Winch.

  • Pipe Handling Systems.

  • Two-Section Stinger Assembly.

  • Accommodation Systems.

  • Helideck Facilities.

  • Mooring Equipment and Anchor Spread.

  • Equipment inventory and completion status to be confirmed during due diligence and inspection.

INVESTMENT HIGHLIGHTS

  • Rare 3,800T Heavy Lift Asset.

  • Significant Historical Capital Investment.

  • Major Conversion Equipment Available.

  • DP3 Offshore Construction Vessel Potential.

  • Large Diameter Pipelay Capability.

  • 320-Person Accommodation Capacity.

  • Suitable for Offshore EPCIC, SURF and Field Development Projects.

  • Potential Alternative to Newbuild Construction Costs.

  • Attractive Opportunity for Offshore Contractors, Vessel Operators and Strategic Investors.

POTENTIAL COMPLETION PROGRAMME

  • Subject to purchaser requirements, technical review and shipyard assessment, the vessel offers the opportunity for:

  • Completion of DP3 conversion works.

  • Completion of pipelay installation package.

  • Final commissioning and testing.

  • Classification reinstatement.

  • DP trials and certification.

  • Offshore operational readiness programme.

  • Detailed completion scope, budget and delivery schedule available subject to owner and shipyard discussions.

BUYER INFORMATION

  • The vessel should presently be considered a partially completed DP3 Heavy Lift & Pipelay Construction Project requiring further technical evaluation, completion and commissioning.

  • Interested parties are encouraged to conduct detailed technical due diligence and inspection prior to submission of commercial offers.

  • Further information, inspection arrangements and commercial discussions available through:

MJM Offshore Ltd

sales@mjmoffshore.com

bottom of page