top of page
TECHNICAL SPECIFICATIONS

Overall Length

90.80m

Beam

.00m

Maximum Draft

.00m

Year Built

2026

Accommodation

150 Berths

Dynamic Positioning

DPS-2

NEW BUILD 90.8M SELF-ELEVATING UNIT (SEU)

ENGINEERED FOR OFFSHORE ENERGY, SUBSEA & RENEWABLE PROJECTS

​

MJM Offshore, in partnership with leading Chinese offshore designers and shipbuilders, offers this advanced Self-Elevating Unit (SEU) concept developed to meet the evolving requirements of the global offshore energy sector.

Designed with flexibility in mind, this proven ABS-approved concept can be customised to suit specific project requirements, operational environments and client preferences.

Suitable for offshore wind farm support, subsea construction, accommodation services, maintenance campaigns, well intervention support and a wide range of offshore infrastructure projects.

KEY FEATURES

  • ABS Class Design Approved

  • Self-Elevating Unit (SEU)

  • DP2 Dynamic Positioning

  • Offshore Accommodation Services

  • Helideck Certified Design

  • Designed for Worldwide Operations

Principal Dimensions

  • Length Overall: 90.8m

  • Hull Length: 64.8m

  • Beam: 40.4m

  • Depth: 6.1m

  • Operating Water Depth: Up to 65m

BUILT AROUND YOUR PROJECT REQUIREMENTS

  • unlike standard offshore units, this SEU can be tailored to suit individual client requirements including:

  • ✔ Accommodation Capacity
    ✔ Crane Configuration
    ✔ Deck Equipment Packages
    ✔ Project-Specific Mission Systems
    ✔ Renewable Energy Support Operations
    ✔ Subsea Construction Campaigns
    ✔ Offshore Maintenance & Intervention Projects

  • Through MJM Offshore's established partnerships with leading Chinese design houses and construction yards, clients benefit from competitive construction pricing, proven engineering solutions and direct project support throughout the build process.

​

  • TO DISCUSS YOUR PROJECT REQUIREMENTS

  • sales@mjmdiving.com

0010 NEW SEU.PNG

Elevating System

  • Four Cylindrical Legs

  • Electric Rack & Pinion Jacking System

  • Heavy-Duty Square Spud Cans

  • Leg Length: 110m Including Spud Cans

Offshore Working Capability

  • 1,400m² Clear Working Deck

  • 150-Tonne Main Crane

  • 20-Tonne Auxiliary Crane

  • Anchor Handling Winches

  • Large Open Deck Area for Project Equipment

Accommodation & Logistics

  • Accommodation for up to 150 Personnel

  • Five-Level Accommodation Block

  • Modern Offshore Welfare Facilities

  • Helideck Suitable for S92A & S61N Helicopter Operations

bottom of page