top of page
TECHNICAL SPECIFICATIONS

Overall Length

42.00m

Beam

11.0m

Maximum Draft

4.15m

Year Built

2026

Accommodation

26 Berths

Dynamic Positioning

DP

Vessel Overview

A multi-functional offshore workboat designed for anchor handling, fire fighting, guarding, assistance, support, anti-pollution, supply, transportation, and ocean towing for marine petroleum drilling platforms.

0002005 4400BHP AHTS.PNG

Key Commercial Highlights

⦁    Builder: China Shipyard 
⦁    Design Institute: Ship Design & Research Institute.
⦁    Classification: BVI HULL, MACH, Tug, Special Service - Anchor Handling Tug/Offshore Support Vessel/ Standby Vessel, Fire Fighting Ship 1- Water Spraying.
⦁    Navigation Area: Unrestricted Navigation Area.
⦁    Flag: Hong Kong.
⦁    Delivery Status: currently 2026.

Main Particulars

⦁    Length Overall (L.O.A.): 42.00 m (excluding bow rudder fenders).
⦁    Beam MLD.: 11.00 m.
⦁    Depth MLD.: 4.90 m.
⦁    Cruising Draft: 3.50 m.
⦁    Max Offshore Draft: 4.15 m.
⦁    Speed: ~12.50 kn.
⦁    Deck Area: ~160.00 m².
⦁    Deck Strength: 5.00 t/m².
⦁    Deck Cargo: 100.00 t.
⦁    Accommodation: 26 persons.

Navigation & Communication

⦁    Radar: 1 x Furuno FAR-2117.
⦁    Echo Sounder: 1 x Furuno FE-700.
⦁    Speed Log: 1 x Furuno DS-80.
⦁    GPS: 1 x Furuno GP-150.
⦁    AIS: 1 x Furuno FA-150.
⦁    GMDSS Area A1+A2: Includes Furuno FS-1570 (MF/HF SSB), Felcom-15 (Inmarsat-C), and FM-8800S (VHF).
⦁    Safety: 1 x TRON 60S (EPIRB), 1 x TRON SART20 (Radar Transponder), and 2 x TRON TR30 (Portable VHF).

Accommodation & Facilities

Tank Capacities

⦁    Cabins: Captain’s Room (1), Chief Engineer’s Room (1), 2-man Officer Rooms (2), 4-man Crew Cabins (5).
⦁    Common Areas: Mess Room (1), Galley (1), Provision Room (1), Freezer/Refrigerated Storage (1).
⦁    Climate Control: Central air conditioning system installed in wheelhouse, mess room, galley, and all officer/crew cabins.
⦁    Galley Equipment: Six-burner electric stove with oven.

⦁    Fuel Oil (F.O.): 356.18 m³.
⦁    Fresh Water (F.W.): 83.31 m³.
⦁    Foam Tank: 9.26 m².
⦁    Dispersant Tank: 5.88 m³.
⦁    Domestic Sewage Tank: 14.45 m³.
⦁    Lube Oil Tank: 3.24 m³.
⦁    Oily Water Tank: 3.13 m³.
⦁    Residual Oil Tank: 3.13 m³.
⦁    Gear Oil Tank: 0.87 m³.

Machinery & Propulsion

⦁    Main Engines: 2 units, Cummins-UK QSK60-M; 2200BHP (1641kW) @ 1800rpm.
⦁    Gearbox: 2 units, Twin Disc - US MGX5600; Ratio 5.76:1.
⦁    Propellers: 2 units, Fixed Pitch 4 Blades Propeller.
⦁    Main Generators: 2 units, Cummins-UK 240MXDG; 240kW, 400V 50Hz.
⦁    Emergency Generator: 1 unit, Cummins-US/China CCFJ-60Y; 60kW, 400V 50Hz.
⦁    Bow Thruster: 1 unit, JYG16FP; 200kW with 3.5t Max Thrust.
⦁    Steering Gear: 1 set, ME - Singapore; 3.5t m Electro-hydraulic

Deck & Auxiliary Equipment

⦁    Towing Winch: 1 unit, ME-Singapore 65THAHTW(C); Double Drum; 65t Recovery Load; 180t Braking Force.
⦁    Anchor Windlass: 1 unit, DZ-China; 2 x 650kg anchors; 26mm AM2 chain.
⦁    Shark Jaw/Towing Pins: 1 unit, ME-Singapore ME200THSJ/200THTP; 200t Load Carrying.
⦁    Deck Crane: 1 unit, LFT-China SQ10Z; 10t@2m / 0.95t@11.6m Hydraulic Folding Crane.
⦁    Capstan: 1 unit, DZ-China; 5t x 15 m/min Hydraulic Vertical Capstan.
⦁    Auxiliary Winch: 1 unit, DZ-China; 10t x 15 m/min Hydraulic Auxiliary Winch.
⦁    External Fi-Fi: FFS-Norway; 2 x 1200m³/h monitors; includes water spray drencher system.

bottom of page